Choose a provider that combines proven uptime (Tier III+ or Tier IV standards), robust power density and redundancy, strong physical and cyber security, scalable connectivity to major carriers and cloud on-ramps, clear compliance certifications (ISO, SOC, ISO 27001, PCI DSS as applicable), transparent SLAs, local operational presence, and competitive commercial terms. For a 15 MW requirement in Noida, prioritize providers with experience delivering high-density racks, reliable diesel/UPS capacity, efficient cooling (including options for liquid cooling), and fast cross-connects to Delhi NCR carrier and cloud ecosystems.
Uptime & redundancy: Ensures service continuity and minimizes costly outages.
Power & cooling capacity: Supports high-density AI/ML and enterprise workloads.
Connectivity: Low-latency access to carriers and hyperscalers is essential for hybrid/cloud deployments.
Security & compliance: Protects sensitive data and satisfies regulatory needs.
Local presence & support: Faster provisioning, maintenance, and relationship management.
Commercial transparency: Predictable costs for capacity, power, and ancillary services.
Facility standards and certifications
Verify the data center’s Tier classification and recent audit reports. Look for ISO 27001, ISO 22301 (business continuity), SOC 2, and any industry-specific compliance (PCI DSS, HIPAA if needed). Ask for third-party test reports and recent maintenance logs.
Power architecture and capacity planning
Confirm total available IT load (MW) and how the 15 MW will be provisioned (pods, halls, or rooms). Check N+1/N+2/2N redundancy for UPS, generators, and transformers. Verify diesel fuel contracts and generator run-time at full load.
Cooling design and PUE expectations
Request actual historical PUE figures, not just design targets. For high-density racks ( >20–30 kW/rack ), discuss hot-aisle/cold-aisle containment, rear-door heat exchangers, and liquid-cooling readiness.
Network ecosystem and carrier neutrality
Ensure carrier-neutrality and multiple fiber routes into the facility. Confirm presence of major carriers, IX peering points, and on-ramps to public cloud providers (AWS Direct Connect, Azure ExpressRoute, Google Cloud Interconnect).
Physical & cybersecurity controls
Review perimeter security, multi-factor access controls, CCTV/retention policies, and SOC/monitoring tools. Ask about vulnerability management, patching cycles, and any 24x7 NOC/SEC operations.
Scalability and space provisioning model
Confirm how the provider scales from initial racks to full 15 MW — typical options include cabinet leases, private cages, suites, or bespoke halls. Clarify lead times for additional racks and power upgrades.
Service level agreements & transparency
Request SLA terms for uptime, power, and network latency. Understand remedies for SLA breaches and the provider’s incident response process. Ask for historical availability metrics.
Operational maturity & local support
Check the provider’s local team size, escalation matrix, maintenance SOPs, and spare-parts inventory. Prefer providers with an on-site engineering team and documented maintenance windows.
Sustainability & green energy programs
If corporate sustainability matters, assess renewable energy options, carbon disclosures, and any onsite energy-efficiency measures (waste heat reuse, waterless cooling).
Commercial terms & total cost of ownership (TCO)
Compare base power costs (kW), PUE-adjusted energy consumption, cross-connect fees, installation and one-time charges, and colocation vs. dedicated build cost. Evaluate multi-year pricing and exit/transition clauses.
Q: How quickly can a typical 15 MW deployment be provisioned in Noida?
A: Provisioning time varies by model. Using pre-built hall/cage space, initial racks and power can be delivered in 6–12 weeks. A bespoke build-out of a private hall may take 6–12 months; plan for lead time on high-density power distribution and permits.
Q: What PUE should I expect for a modern Noida data center?
A: Modern facilities commonly achieve annualized PUEs between 1.2 and 1.5. High-density, well-managed sites aiming for efficiency and sustainability may report PUE ≤1.3; ask for monthly or quarterly figures to avoid seasonal bias.
Q: Is carrier neutrality essential?
A: Yes — carrier-neutral facilities provide competition, lower latency, and redundancy. For hybrid-cloud and multi-cloud designs, direct connectivity to cloud on-ramps (Direct Connect/ExpressRoute) is critical.
Q: How much redundancy is necessary for mission-critical workloads?
A: Mission-critical setups typically require at least N+1 for components and 2N or N+N for site-level redundancy. Discuss acceptable downtime and map that to SLA expectations.
Q: How should I evaluate security controls?
A: Ask for access logs, retention periods, SOC reports, and penetration test results. Verify multi-factor access, mantrap entry, and security monitoring capabilities.